Project:
RANS21RB
-
Listing for Category : empennage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (679)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
-
HP Fuel Pump Assembly
-
Header tank
-
Header tank
-
Header Tank
-
Header Tank
-
Header Tank
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (52)
-
Upper Cowling work;...
-
Cowling
-
Inspection panels
-
Prep for...
-
Cowling
-
Details
-
W & B
-
Fuel Flow test and...
-
Prep for W & B
-
Rear Windows and...
-
Doors
-
Air Intake Seal and...
-
Punch list
-
Ignition Coil and paint
-
Doors
-
Paint, Windshield...
-
Paint
-
Gap seals
-
Paint
-
Cowling
-
Wiring
-
Paint
-
Paint Prep
-
Doors
-
Cowling and Ignition
-
Ignition...
-
Engine run #2
-
First Engine Run
-
Cowling
-
Cowling
-
Cowling
-
Brakes, Prop,...
-
Cowling, trim tab
-
Engine
-
Details
-
Details
-
Rigging
-
Details
-
Various details
-
Rudder Cables
-
Rigging and final...
-
Rigging
-
Wingtips and ailerons
-
Flight controls and...
-
Skylight and flight...
-
Flight Controls
-
Elevator Trim and...
-
Elevator and...
-
Aileron and rudder...
-
Seats and Aileron...
-
Skylight and fairings
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1991
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Mar 08, 2024
Vertical Stab and Rudder cables
- (3 hours)
Category: Empennage
Final assembly of vertical stabilizer and rudder cables. Tightened and torqued all 10 mounting bolts on front and rear vertical stab spar attachments. Installed rudder stop block on rear spar attachment. Installed rudder horn on rudder post. Installed rudder cables to rudder horn. Ensured cables were routed properly on all pulleys. Attached tailwheel steering spring, cable and S hooks to tailwheel. This is definitely a 2-person job as the stab mounting bolts and rudder horn are very difficult to access and tighten due to confined space. It's really starting to look like an airplane again.
20240308_105859.jpg
20240308_105929.jpg
20240308_110723.jpg
20240308_121024.jpg
20240308_121142.jpg
20240308_121157.jpg
Mar 07, 2024
Vertical Stab
- (2 hours)
Category: Empennage
Installed all mounting bolts for vertical stab. Only able to tighten 3 bolts on my own. Will get help next session. Mounted rudder stop block on rear spar attachment.
Also, fabricated and installed a cover for the electric fuel boost pump. My kit did not come with this cover. Fabricated using a friends cover as a pattern and used .040 6016.
Mar 06, 2024
Horizontal and Vertical Stab Mounting
- (1.5 hours)
Category: Empennage
Mounted horizontal stab. First snugged up incidence adjusters on front to lowest setting per manual for the Titan 340. Leveled stab with wings visually. Made slight adjustment to raise right incidence adjuster a very small amount. Tightened socket screws and used blue loctite. Placed 2 AN970-4 large washers between rear spar and rear mounting bolts to take up gap. Drilled and reamed left rear mount bolt and torqued all mount bolts. Horizontal stab is final mounted. Assembled rudder to Vertical Stab using proper hinge bolts which were tightened. Installed vertical stab/rudder combo in fuselage. Temporarily attached Vertical stab using 2 bolts. Will finish installing all bolts next session.
20240306_103235.jpg
20240306_103242.jpg
20240306_104729.jpg
20240306_184547.jpg
20240306_184612.jpg
May 09, 2023
Horizontal Stab fairing
- (2.5 hours)
Category: Empennage
Drilled and installed all nutplates in horizontal stab for the stab to fuselage faring. Started install of wingtip strobe/nav lights. Measured tip for drilling.
20230509_114818.jpg
20230509_114853.jpg
May 23, 2021
Elevator
- (4.3 hours)
Category: Empennage
Completed riveting elevator tips. Fit trim servo motor and trim tab. Stored elevator. Gathered wing spars, bellcranks and wing ribs to begin left wing construction.
20210523_102953.jpg
20210523_103006.jpg
20210523_103014.jpg
20210523_103053.jpg
20210523_135012.jpg
May 23, 2021
Elevator
- (2.2 hours)
Category: Empennage
Sealed tip rib with silicone for future epoxy/lead balancing. Riveted bottom of tip skins to tip frame.
May 21, 2021
Elevator
- (4.5 hours)
Category: Empennage
Finished riveting top elevator skins. Riveted tip rib to elevator. Clecoed and fit tip skins. Match drilled tip skin.
20210521_123852.jpg
20210521_123905.jpg
20210521_123911.jpg
20210521_123931.jpg
May 19, 2021
Elevator
- (5.5 hours)
Category: Empennage
Took bottom skin off frame to re-bend the leading edge. It did not match up to allow riveting after the initial 90 deg. bend. Bent both top and bottom leading edges slightly more and then re-clecoed the skins back on the frame. This allowed leading edges to match up for riveting. Riveted the bottom skin and leading edge. Cut bend tabs off tip skins and cleaned up. Riveted bulkhead rib to tip rib. Match drilled tip rib to elevator end ribs.
20210519_123403.jpg
20210519_140628.jpg
May 18, 2021
Elevator
- (4.7 hours)
Category: Empennage
Trimmed hinges on trim tab for better fit. Match drilled trailing edge skins. Took skins off to deburr and clean. Clecoed skins back on and began to rivet.
May 18, 2021
Elevator
- (2.3 hours)
Category: Empennage
Riveted hinges to elevator and trim tab. Test mounted Ray Allen Trim motor and tested operation. All OK.
May 16, 2021
Elevator
- (6.7 hours)
Category: Empennage
Match drilled and clecoed trim tab. Riveted trim tab together. Clecoed bottom skin on elevator. Aligned and measured trim tab hinges. Drilled and clecoed to elevator and tab.
20210516_093303.jpg
20210516_144111.jpg
20210516_144122.jpg
May 14, 2021
Elevator
- (3 hours)
Category: Empennage
Formed leading edge of elevator skins using PVC pipe per the plans. Laid out and riveted ribs to trim tab and clecoed skin in prep for riveting. Cut hinge stock in prep for measuring and mounting hinges on trim tab/elevator.
20210513_121216.jpg
20210515_085052.jpg
20210515_085102.jpg
May 15, 2021
Elevator
- (1 hour)
Category: Empennage
Clecoed top elevator skin to prep for trim tab fitting.
May 12, 2021
Elevator
- (4 hours)
Category: Empennage
Deburred ribs and spars; riveted elevator horn; clecoed and riiveted frame; test fit tab to elevator.
May 08, 2021
Elevator
- (0.9 hour)
Category: Empennage
Drilled out screw holes in trim servo ribs and installed nut plates for servo mounting. Up-drilled servo mounting holes to #20 per plans. Test mounted servo for fit and tested operation with 9V battery. Works normally.
20210508_100111.jpg
May 08, 2021
Elevator
- (1.8 hours)
Category: Empennage
Riveted horizontal stab tips. Initial assembly of elevator frame to check for fit and do inventory of parts needed for elevator and trim tab.
20210508_100058.jpg
May 04, 2021
Horizontal Stabilizer
- (0.6 hour)
Category: Empennage
Final drilled horizontal tips for install. Glued 1/8" backing washers prior to riveting.
May 03, 2021
Horizontal Stabilizer
- (5.7 hours)
Category: Empennage
Final riveting both skins of horizontal stab. Fit and drilled stab tips for riveting.
Final riveting Horizontal Stab (1).jpg
Final riveting Horizontal Stab (2).jpg
Final riveting Horizontal Stab (3).jpg
Final riveting Horizontal Stab (4).jpg
May 03, 2021
Horizontal Stabilizer
- (2.6 hours)
Category: Empennage
Dimpled nose ribs with pop rivet puller. Had to grind die to modify so it fit into flange of nose rib for dimpling. Clecoed top and bottom skins and started to rivet.
20210502_113601.jpg
20210502_113613.jpg
Apr 30, 2021
Horizontal Stabilizer
- (5.6 hours)
Category: Empennage
Riveted Ribs and nose ribs to front and rear spar, dimpled skins in center section and countersunk front spar on top and bottom flange in center section.
Riveted all ribs to spars, dimpled skins and countersunk spars 30 April 2021 (1).jpg
Riveted all ribs to spars, dimpled skins and countersunk spars 30 April 2021 (2).jpg
Riveted all ribs to spars, dimpled skins and countersunk spars 30 April 2021 (3).jpg
Riveted all ribs to spars, dimpled skins and countersunk spars 30 April 2021 (4).jpg
Riveted all ribs to spars, dimpled skins and countersunk spars 30 April 2021 (5).jpg
Apr 28, 2021
Horizontal Stabilizer
- (5.4 hours)
Category: Empennage
Completed disassembly of spars, doublers and ribs. Finished deburring spar match drilled holes. Riveted doublers to front and rear spars. Riveted inspection plate reinforcement rings in place. Test dimpled scrap aluminum and set countersink depth in prep for riveting center section of skins with countersunk rivets.
20210428_112204.jpg
20210428_152240.jpg
20210428_152246.jpg
20210428_152314.jpg
Apr 27, 2021
Horizontal Stabilizer
- (4.3 hours)
Category: Empennage
Removed all clecos and deburred spar holes that were match drilled. Drilled stab tips for install. Clecoed inspection covers reinforcement rings.
Apr 26, 2021
Horizontal Stabilizer
- (3.5 hours)
Category: Empennage
Completed match drilling and up-sizing skin to spar holes to #30. Trimmed bend tabs from skin. Trial fit Aerosport tip fairings-- which are a prefect fit with no trimming required.
20210426_165440.jpg
20210426_165446.jpg
Apr 25, 2021
Horizontal Stabilizer
- (2.2 hours)
Category: Empennage
Match drilled bottom skin front and rear spar flanges.
Apr 24, 2021
Horizontal Stabilizer
- (1.6 hours)
Category: Empennage
Clecoed bottom skin. Ready for match drilling spars.
20210424_142931.jpg
20210424_142942.jpg
20210424_142953.jpg
20210424_143000.jpg
Apr 23, 2021
Horizontal Stabilizer
- (1.5 hours)
Category: Empennage
Clecoed top skin in place.
Apr 23, 2021
Horizontal Stabilizer
- (5.6 hours)
Category: Empennage
Cleaned and deburred spars, doublers and ribs. Clecoed assembly today. Fit skins initially.
20210422_135358.jpg
20210422_135530.jpg
20210422_164726.jpg
20210422_164737.jpg
Apr 21, 2021
Horizontal Stabilizer
- (3.5 hours)
Category: Empennage
Modified Wing cradle to hold vertical stab and rudder temporarily. Leveled and clamped my 6ft and 8ft work table together for the horizontal stab assembly.
Inventoried and laid out all parts for the horizontal stab and aligned spars and doublers in correct orientation.
Apr 19, 2021
Vertical Stab Top Fairing and Pull Handle
- (2.2 hours)
Category: Empennage
Completed assembly and install of tail pull handle. Test fit rudder and Vertical Stab tip fairing.
20210417_124635.jpg
20210419_093010.jpg
20210419_093107.jpg
20210419_100004.jpg
20210419_100026.jpg
20210419_100038.jpg
20210419_100106.jpg
20210419_100143.jpg
20210419_100210.jpg
Apr 18, 2021
Vertical Stab Top Fairing and Pull Handle
- (2.6 hours)
Category: Empennage
Finish fabricating tail pull handle per the plans. Used JB weld to glue the handle doublers together. Started fitting top tail cone fairing. Fairing is aftermarket from Aerosport Products which fit perfectly the first time- no trimming required.
Apr 17, 2021
Vertical Stab and Pull Handle
- (3.2 hours)
Category: Empennage
Completed riveting of side skins and leading edge skins. Began install of pull handle. Drilled out initial 3/4" hole in skins.
20210417_124557.jpg
20210417_124608.jpg
20210417_124618.jpg
20210417_124635.jpg
Apr 16, 2021
Vertical Stab
- (3.2 hours)
Category: Empennage
Continued riveting skins. Completed left side skin and leading edge skin.
20210416_083933.jpg
20210416_092810.jpg
20210416_103203.jpg
Apr 15, 2021
Vertical Stab
- (2.5 hours)
Category: Empennage
Removed clecos, cleaned and deburred the match-drilled holes in the front spar, leading edge skin and side skins. Clecoed skins back on, aligned surface and began pulling rivets on side skin.
Apr 14, 2021
Vertical Stab
- (3.5 hours)
Category: Empennage
Leveled and secured assembly. Removed leading edge skin and edge-formed the trailing edges for overlap of side skins. Clecoed back in place and match drilled leading edge skin, side skins and front spar. Clecoed in place. Initial fitment of tail pull handle doubler plates.
20210414_103331.jpg
20210414_103338.jpg
20210414_103347.jpg
20210414_103434.jpg
20210414_111118.jpg
20210414_130131.jpg
Apr 13, 2021
Vertical Stab
- (2 hours)
Category: Empennage
Fit side and leading edge skins to frame.
20210413_105048.jpg
20210413_105059.jpg
Apr 12, 2021
Vertical Stab
- (5.5 hours)
Category: Empennage
Inventoried all vertical stab parts. Flutted ribs to straighten, then clecoed all parts together. Pressed in bushings in rudder hinges. Riveted front spar doublers first, then the rear spar doublers, then all the ribs. Finally, riveted hinges to rear spar taking care to install an AN3 bolts in the hinges prior to riveting. Reamed hinges bushings to 3/16".
Vertical Stabilizer assembly 041221 (3).jpg
Vertical Stabilizer assembly 041221 (6).jpg
Vertical Stabilizer assembly 041221 (7).jpg
Vertical Stabilizer assembly 041221 (8).jpg
Mar 19, 2021
Rudder Build
- (4.5 hours)
Category: Empennage
Attended RANS Rudder Build Workshop. Constructed Rudder under Eddie's supervision. Great class. Great people at RANS.
Rudder Build Workshop 19 March 2021 (1).jpg
Rudder Build Workshop 19 March 2021 (10).jpg
Rudder Build Workshop 19 March 2021 (17).jpg
Rudder Build Workshop 19 March 2021 (7).jpg